Tilbury Douglas Tilbury Douglas
  • About
    • About us
    • Digital
    • ESG
    • Financial updates
    • Health, safety and wellbeing
    • History
    • Inclusive procurement
    • Leadership team
    • Policies, reports and certificates
    • Supply chain
    • Sustainability
  • Sectors
    • Central and local government
    • Defence
    • Devolved government
    • Education
    • Health
    • Justice
    • Water
  • Services
    • Regional Building
    • Fit-Out
    • Engineering
    • Infrastructure
  • Projects
  • Frameworks
  • News & media
    • Press releases
    • Insight articles
    • Videos
  • Careers
    • Overview
    • Current vacancies
    • Early careers
    • Women in construction
  • Contact
    • Contact details
    • Office locations
7 October 2025

Construction excellence behind Scotland’s cultural icon

Barry O’Hagan, Regional Director – Scotland at Tilbury Douglas, shares how the company delivers the high-profile, technically complex Tattoo Stadium safely and seamlessly within a historic and sensitive setting.

The Royal Edinburgh Military Tattoo is one of Scotland’s most iconic cultural showcases, welcoming more than 220,000 spectators each August and broadcasting to more than 100 countries worldwide.

For more than a decade, Tilbury Douglas has been entrusted with the task of delivering its grand stage: a 9,000-seat stadium constructed each summer on Edinburgh Castle’s Esplanade, itself part of a UNESCO World Heritage Site.

In 2024, we were proud to secure a new five-year framework with The Royal Edinburgh Military Tattoo Limited, following the successful delivery of the stadium in previous years. 2025 marks the 11th consecutive year we have built the stadium for this prestigious event. This continuity not only demonstrates the trust placed in us by our client but also underlines our ability to deliver a technically demanding project safely, on time, and to the highest standards.

Building within a historic environment

In May each year, our team arrives at an empty Castle Esplanade and, in just 40 days, transforms it into a fully functioning arena capable of hosting not only the Tattoo but also international concerts.

The scale is immense:

  • 760–800 tonnes of steel
  • 6,800+ individual sections
  • 1,600–1,700 crane lifts
  • 35 miles of cabling

All of this is delivered while up to 12,000 visitors pass through the site daily enroute to the castle. It requires meticulous sequencing, close coordination with multiple stakeholders, and a steadfast commitment to heritage protection.

A digital-first, sustainable approach

The project’s complexity is matched by our digital-first approach. Using 3D modelling and 4D scheduling, we rehearse every lift, delivery, and sequence before setting foot on site.

Sustainability sits at the heart of the build. Each year, the structure is dismantled and carefully stored for reuse, avoiding the carbon cost of remanufacture.

We also:

  • Source predominantly within a 30-mile radius
  • Employ repeat supply chain partners to reduce transport emissions
  • Reuse almost all materials, generating minimal waste
  • Operate with electric tower cranes, LED lighting, and green fuel

Safety, skills, and social impact

Health and safety remain non-negotiable. In over a decade of delivery, our record reflects rigorous planning, daily briefings, and a strong safety culture.

We are equally committed to skills and community. Apprentices and graduates are embedded within the project team each year, gaining exposure to one of the UK’s most complex logistical builds. Many have since progressed into senior roles, while on-site tours and mentoring help inspire the next generation.

The Tattoo itself delivers far-reaching benefits:

  • £100 million annual contribution to Edinburgh’s economy
  • £30 million in employment value
  • £750,000 donated annually to military and arts charities

This approach generates around £1.4 million in social value annually and delivers a 49% social value return.

The Tattoo (interesting facts):

  • First staged in 1950
  • Granted Royal title in 2010 by Queen Elizabeth II
  • HRH The Princess Royal has served as Patron since 2006

The word Tattoo derives from the 17th-century Dutch phrase Doe den tap toe (“turn off the taps”), a signal for innkeepers to stop serving ale and for troops to return to base. Over time, this evolved into “Taptoo” and then “Tattoo”.

Pride in every build

The Tattoo’s 75th anniversary in 2025 carried the theme “The Heroes Who Made Us”, a reminder of the event’s deep cultural and emotional resonance. For our team, delivering the stadium is more than construction – it is a privilege to create a stage that unites global performers, celebrates heritage, and contributes so much to Scotland’s culture and economy.

I am immensely proud of what our team achieves year after year. The Royal Edinburgh Military Tattoo project is a true demonstration of Tilbury Douglas’ ability to combine technical mastery, digital innovation, and social value in service of a client and a community that demand nothing less than excellence.

Tilbury Douglas
Twitter LinkedIn YouTube

Tilbury Douglas
30 Eastcheap
London
EC3M 1HD

0121 782 2727

  • Projects
  • Frameworks
  • Press releases
  • Modern slavery
  • Cookie policy
Build UK logo

Content © 2026 © 2026 Tilbury Douglas Construction Limited
Registered in England and Wales: 00303359 (Construction) and 03044398 (Engineering). All rights reserved.

Powered by Greenhouse