Braidhurst Industrial Estate
-
Location: Motherwell
-
Sector: Industrial
-
Service: Regional Building
Tilbury Douglas was appointed by North Lanarkshire Council to regenerate Braidhurst Industrial Estate, a 4.5 hectare estate dating from the 1960s in Forgewood, Motherwell. The £7 million project transformed vacant and underused brownfield land while modernising existing business accommodation and infrastructure.
Ten new low carbon, net zero incubator units were created for startups and SMEs, alongside the refurbishment of six existing industrial units and extensive estate wide improvements.
Sustainability, accessibility and flexibility were central to the scheme, helping create adaptable premises that can respond to changing tenant requirements.
The completed development supports North Lanarkshire Council’s wider regeneration and inclusive growth ambitions by improving local business infrastructure, encouraging inward investment and creating opportunities for employment and enterprise.
Careful phasing and stakeholder engagement enabled businesses to remain operational throughout delivery.
At a glance...
£7m
Project value
June 2025
Completion date
North Lanarkshire Council
Customer
Innovation and technical excellence
Low carbon design was integrated from the outset, creating flexible industrial accommodation capable of adapting to the changing needs of startups and SMEs. The 10 new incubator units combined a net zero building approach with ground source heat pumps, on site energy generation and energy efficient building services.
Electric vehicle charging, active travel facilities and high speed digital connectivity were incorporated across the estate, providing future ready infrastructure for occupiers.
The project also retained and refurbished six existing industrial units, extending the value of established assets as part of the wider regeneration.
Early collaboration between Tilbury Douglas, the design team and specialist supply chain enabled sustainability measures to be coordinated alongside complex utilities and civil engineering works. Engagement with Network Rail also allowed restrictions associated with the neighbouring railway to be identified and managed early.
Together, these measures created a modern, connected and adaptable business environment with sustainability embedded across both the buildings and wider estate.
Community and social impact
Community benefits were embedded throughout delivery through collaboration with North Lanarkshire Council, local stakeholders and Braidhurst High School.
The team provided site visits, health and safety workshops, employability presentations and more than 20 hours of curriculum linked training, giving pupils practical insight into construction careers. Five work experience placements were delivered, alongside a dedicated apprenticeship opportunity targeted at applicants from the local community.
Tilbury Douglas also supported local charities and community organisations through financial contributions, volunteering and practical labour. More than 80% of subcontractor spend remained within the local area, supporting businesses, protecting employment and maximising the local economic benefit of the £7 million investment.
Beyond construction, the regenerated estate provides modern premises for startups and SMEs, helping encourage enterprise, inward investment and future employment. Together, these activities created immediate opportunities for local people while supporting the area’s longer-term inclusive growth.
Delivery and performance
The project was delivered within a live industrial estate, where existing businesses needed to remain operational throughout construction. Tilbury Douglas used phased delivery, dedicated logistics management and a robust communications plan to maintain access and manage occupier expectations.
Regular liaison with businesses, estate representatives, North Lanarkshire Council and Network Rail allowed constraints to be identified early and works coordinated around operational requirements.
Disruptive civil engineering activities and works within occupied units were undertaken outside normal hours where necessary, helping safeguard business continuity and maintain programme momentum.
The team also managed ageing infrastructure, utility diversions and retained asbestos roof systems. Robust safety procedures were implemented, with experienced personnel and specialist subcontractors appointed for asbestos-related works to protect operatives and tenants. Early contractor and supply-chain engagement, staged enabling works and proactive risk management supported the coordinated delivery of the new units, existing building refurbishments and estate-wide infrastructure improvements.