Tilbury Douglas Tilbury Douglas
  • About
    • About us
    • Digital
    • ESG
    • Financial updates
    • Health, safety and wellbeing
    • History
    • Inclusive procurement
    • Leadership team
    • Policies, reports and certificates
    • Supply chain
  • Sectors
    • Civic and civil government
    • Defence
    • Devolved government
    • Education
    • Health
    • Justice
    • Water
  • Services
    • Regional Building
    • Fit-Out
    • Engineering
    • Infrastructure
  • Projects
  • Frameworks
  • News & media
    • Press releases
    • Insight articles
    • Videos
  • Careers
    • Overview
    • Current vacancies
    • Early careers
    • Women in construction
  • Contact
    • Contact details
    • Office locations

Kirkliston Primary School
and Early Learning Centre

  • Location: Edinburgh
  • Sector: Education
  • Service: Regional Building

Tilbury Douglas was appointed by the City of Edinburgh Council to construct the new Kirkliston Primary School and Early Learning Centre. This £9 million project was built on land next to the Kirkliston Leisure Centre, which remained operational throughout the construction.

View gallery Key stats

The single-storey building spans 1,342m² and provides high-quality learning spaces for 128 children, with 16 outdoor places aligned with the “Space to Grow” initiative.

The facility was designed with a focus on sustainability, adhering to The City of Edinburgh Council’s Carbon Vision 2030 and meeting Scottish Futures Trust’s targets for energy efficiency. Renewable technologies, including Air Source Heat Pumps and Photovoltaics, were installed, and the building achieved an EPC rating of A.

The building’s design reflects a fabric-first approach, using a glulam frame and Cross Laminated Timber (CLT) panels for the internal partitions, external walls, and roof.

This approach minimises energy demands while optimizing comfort, air quality, and natural daylighting. The building’s energy consumption is projected at 67kWh/m²/annum, aligning with Scottish Futures Trust targets.

At a glance...

£9m

Project value

June 2024

Completion date

City of Edinburgh Council

Customer

Challenges and solutions

Challenge: Maintaining good relationships with the adjacent live Leisure Centre staff, visitors, and neighbouring residents.

Solution: We adopted the principles of the Considerate Constructors Scheme, ensuring early engagement with key stakeholders. We developed a robust Communication Plan and implemented stringent noise and dust control measures to minimise disruption. This proactive approach allowed the leisure centre to remain fully operational and maintained strong relationships with the surrounding community.

Challenge: Ground Investigation Report advised that the ground contained contaminants.

Solution: To address this, we appointed a specialist to design a gas-proof membrane and below-slab venting system. This solution was compatible with the building’s foundations and floor slab insulation design, ensuring the project met all safety and structural requirements while maintaining the high sustainability standards.

Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in

Added value

Tilbury Douglas exceeded the Customer’s expectations in delivering social value, with over 90% of the project’s value spent on local small and medium enterprises (SMEs) and a 45% Social Value Return on Investment. We actively engaged with local schools, providing workshops, careers fairs, STEM activities, and on-site work experience opportunities. Over 100 hours of volunteering were recorded, benefiting local events, community gardens, and the neighbouring sports centre.

“Working with Tilbury Douglas on the delivery of our new school has been a genuinely collaborative and rewarding experience. From the outset, the team made a clear effort to involve us, not just in decision making, but in a shared journey. Their engagement with our staff and students was exceptional, and it’s been wonderful to see our young learners so inspired by the process.

The new school has transformed the way we teach and learn. The purpose-built spaces for our Primary 1 and Nursery children have made a significant impact, creating a welcoming, stimulating environment that truly supports early years development. Staff have benefitted from modern, flexible facilities that allow for better planning, communication, and pupil support.

Beyond the build, Tilbury Douglas made a real effort to become part of our school community. From delivering engaging classroom talks and hosting student site visits, to supporting our Kirkliston Gala Day preparations, their contribution to social value has been both meaningful and memorable. It’s clear that they care about leaving a positive legacy, not just a building, but a stronger, more connected community.”

Lucy Henderson, Head Teacher, Kirkliston Primary School

Our partners

  • Architect: Holmes Miller
  • Structural Engineer: Narro
  • M&E Services Engineer: RSP
Tilbury Douglas
Twitter LinkedIn YouTube

Trading address:
Oberon Road
Exeter Business Park
Exeter
EX1 3QD

0121 782 2727

  • Projects
  • Frameworks
  • Press releases
  • Modern slavery statement
  • Cookie policy
Build UK logo

Content © 2026 © 2026 Tilbury Douglas Construction Limited
Registered in England and Wales: 00303359 (Construction) and 03044398 (Engineering)
Registered office: 30 Eastcheap, London, EC3M 1HD. All rights reserved.

Powered by Greenhouse