Tilbury Douglas Tilbury Douglas
  • About
    • About us
    • Digital
    • ESG
    • Financial updates
    • Health, safety and wellbeing
    • History
    • Inclusive procurement
    • Leadership team
    • Policies, reports and certificates
    • Supply chain
  • Sectors
    • Central and local government
    • Defence
    • Devolved government
    • Education
    • Health
    • Justice
    • Water
  • Services
    • Regional Building
    • Fit-Out
    • Engineering
    • Infrastructure
  • Projects
  • Frameworks
  • News & media
    • Press releases
    • Insight articles
    • Videos
  • Careers
    • Overview
    • Current vacancies
    • Early careers
    • Women in construction
  • Contact
    • Contact details
    • Office locations

Royal Edinburgh Military Tattoo

  • Location: Edinburgh
  • Sector: Leisure
  • Service: Regional Building

Tilbury Douglas is responsible for the annual construction and operation of the temporary grandstands for The Royal Edinburgh Military Tattoo at Edinburgh Castle.

View gallery Key stats

The relationship has continued for 13 consecutive years through a long-term framework with Royal Edinburgh Military Tattoo Limited. Each summer, the Castle Esplanade is converted into a temporary stadium providing approximately 9,000 seats for 24 performances during August.

Tilbury Douglas manages the complete process, from storage and mobilisation through to installation, facilities management and dismantling. The programme is delivered while Edinburgh Castle remains open to visitors, requiring detailed logistical planning and close coordination with the Customer, Historic Environment Scotland, security services and neighbouring businesses. The venue accommodates more than 220,000 spectators over the course of the event.

The annual works include transporting the grandstand components from the Livingston storage yard and assembling more than 6,800 individual steel sections on the Castle Esplanade. Installation requires approximately 1,700 crane lifts and 35 miles of cabling. Tilbury Douglas also installs and fits out 24 two storey VIP units covering 660m², 24 performer units forming 12 open plan spaces across 720m², and 46 under stand units.

These provide toilets, first aid facilities, storage, retail space and electrical and operational accommodation. During the Tattoo and associated concerts, the team provides facilities management and undertakes regular checks of the seating and structure. Following the event, the grandstands and accommodation are dismantled and returned to Livingston, where each component is cleaned, inspected and maintained in preparation for the following year.

At a glance...

April – October annually

Dates

Royal Edinburgh Military Tattoo

Customer

Innovation and technical excellence

The stadium design is reviewed annually to reflect each production’s requirements and respond to changes in safety standards and building regulations. Recent modifications have included fire safety upgrades to the VIP suites and the installation of a new passenger lift. Collaborative design reviews also identified an opportunity to create 75 additional seats within the existing arrangement, increasing capacity and generating additional ticket revenue for the Customer.

The structure can be adapted to accommodate specific production elements, including the suspension of a full size replica F 35 aircraft beneath the main steel trusses. Each structural component is individually numbered, allowing deliveries and installation to follow a controlled sequence within the limited working area. Environmental improvements have included replacing under-stand lighting with energy-efficient LEDs and reviewing the modular accommodation to identify options for reducing its carbon footprint.

“Thanks to Tilbury Douglas and our hard working operations team, our world renowned Edinburgh Castle Arena is ready to welcome thousands of spectators from across the globe each year. There’s nowhere more iconic for an outdoor show, and we’re proud to deliver our successful events, in partnership with all our important stakeholders, year on year right here in Edinburgh.”

Jason Barrett, The Royal Edinburgh Military Tattoo Chief Executive

Community and social impact

The project supports the annual delivery of The Royal Edinburgh Military Tattoo, which welcomes more than 220,000 spectators across its August programme and is broadcast to audiences worldwide. Throughout construction and dismantling, Edinburgh Castle remains open to the public. Works are therefore planned to maintain safe visitor access and limit disruption at the Castle Esplanade.

Tilbury Douglas maintains regular communication with Historic Environment Scotland, local businesses and neighbouring organisations to coordinate deliveries, lifting activities and changes to access during the busy festival period. The long-term framework also provides continuity for the project team and specialist supply chain, retaining knowledge of the venue and its operational requirements. The completed temporary development provides the seating, accommodation and supporting facilities required by spectators, performers, event staff and emergency services.

Delivery and performance

The annual programme is delivered in four phases covering installation, event operations, dismantling, and inspection and maintenance. Installation takes approximately eight weeks, with numbered components transported from Livingston in a defined sequence and to a detailed timetable. Tilbury Douglas then provides facilities management and structural and seating checks throughout the Tattoo and associated concerts. Dismantling is completed over six to seven weeks before components are inspected and maintained in storage.

Delivery takes place within a constrained site used by thousands of visitors each day, requiring controlled lifting operations, defined working areas and carefully managed public access. Daily liaison with Royal Edinburgh Military Tattoo Limited, Historic Environment Scotland, military and police representatives, security services and neighbouring businesses allows the works to be coordinated around visitor, venue and event requirements.

Zoom in
Zoom in

Our partners

  • Structural Engineer: Buro Happold
  • Architect: 56Three Architects
  • Framework: Royal Edinburgh Military Tattoo Framework
Tilbury Douglas
Twitter LinkedIn YouTube

Trading address:
Oberon Road
Exeter Business Park
Exeter
EX1 3QD

0121 782 2727

  • Projects
  • Frameworks
  • Press releases
  • Modern slavery statement
  • Cookie policy
Build UK logo

Content © 2026 © 2026 Tilbury Douglas Construction Limited
Registered in England and Wales: 00303359 (Construction) and 03044398 (Engineering)
Registered office: 30 Eastcheap, London, EC3M 1HD. All rights reserved.

Powered by Greenhouse