Tilbury Douglas Tilbury Douglas
  • About
    • About us
    • Digital
    • ESG
    • Financial updates
    • Health, safety and wellbeing
    • History
    • Inclusive procurement
    • Leadership team
    • Policies, reports and certificates
    • Supply chain
  • Sectors
    • Central and local government
    • Defence
    • Devolved government
    • Education
    • Health
    • Justice
    • Water
  • Services
    • Regional Building
    • Fit-Out
    • Engineering
    • Infrastructure
  • Projects
  • Frameworks
  • News & media
    • Press releases
    • Insight articles
    • Videos
  • Careers
    • Overview
    • Current vacancies
    • Early careers
    • Women in construction
  • Contact
    • Contact details
    • Office locations

Waseley Hills High School

  • Location: Rednal
  • Sector: Education
  • Service: Regional Building

Tilbury Douglas was appointed to deliver the redevelopment of Waseley Hills High School on behalf of the Department for Education (DfE), creating a modern, net zero carbon secondary school for more than 1,000 pupils.

View gallery Key stats

Delivered over three carefully planned phases on a live school campus, the project involved replacing ageing buildings with two new teaching blocks, specialist learning spaces and a dedicated Special Educational Needs department.

Having worked collaboratively with the DfE, school leadership and the local planning authority, the design was refined to enhance the campus layout, improve community access to sports facilities and create inspiring learning environments. Designed to DfE Spec 21 standards, the new school provides sustainable, modern educational facilities that support both academic achievement and long term community use.

The project comprised the phased demolition of the existing school buildings and construction of two new two storey teaching blocks while uninterrupted school operations were maintained throughout.

The new facilities included general and specialist classrooms, dining areas, Special Educational Needs provision, external landscaping and a Multi-Use Games Area (MUGA).

Delivered to DfE Spec 21 and net zero carbon standards, the development incorporated air source heat pumps, natural ventilation with heat recovery, thermal mass construction and 723 photovoltaic panels to create a fully electric campus, with gas retained only for specialist science laboratories. Extensive external works included new drainage infrastructure, hard landscaping and sustainable site improvements.

Careful decant planning, stakeholder coordination and phased handovers enabled teaching and learning to continue safely while construction progressed.

At a glance...

£34.5m

Project value

May 2027

Completion date

Department for Education

Customer

Innovation and technical excellence

Innovation was key to the delivery of Waseley Hills High School from the earliest design stages. Early contractor and supply chain involvement enabled thermal modelling, structural optimisation and coordinated mechanical and electrical (M&E) design to achieve the project’s ambitious net zero carbon objectives. The building integrated natural ventilation with heat recovery units, air source heat pumps, thermal mass and 723 photovoltaic panels to maximise operational efficiency.

Detailed ground investigations were undertaken during the pre construction period which informed a value engineered piled foundation solution, and improved programme certainty while reducing construction costs. The design was further enhanced through bespoke architectural features, which included a refined roof profile, upgraded façade treatments and specialist finishes within teaching spaces. Collaborative planning with the DfE and local authority also enabled the campus layout to be redesigned, improving safeguarding and creating dedicated community access to sports facilities without compromising operational efficiency.

“We are delighted that our students will now be educated in a world class environment which matches our ambition for their future lives and careers. They will be able to be inspired and challenged to reach heights they never knew they could reach in our new build which showcases the technology available to facilitate exceptional learning…This forms part of our Central Region Schools Trust (CRST) core mission to enact social justice through exceptional schools.”

Tom Preston, Principal

Community and social impact

Creating lasting value for the local community was  a key objective throughout the project. Construction activities were carefully planned to minimise disruption to Waseley Hills High School and neighbouring Hollywell Primary School, with delivery schedules aligned to avoid peak school traffic.

The project team delivered careers fairs, construction workshops and educational sessions with local pupils, helping to promote careers within the construction industry. Social value initiatives also included improvement works at Churchill Primary School and donations to a local food bank as part of Tilbury Douglas’ Winter Wishes campaign.

The completed development provides enhanced sports facilities designed to support community use outside school hours, extending the benefits beyond the school itself. The project’s commitment to responsible construction was recognised through the achievement of a perfect 45/45 Considerate Constructors Scheme score.

Delivery and performance

Delivering a major redevelopment on a live secondary school campus required meticulous planning, collaborative working and robust risk management. Tilbury Douglas developed a phased construction strategy that maintained uninterrupted teaching, safeguarded pupils and staff, and ensured safe access throughout the programme.

Early engagement with the client, design team and specialist supply chain reduced programme risk by resolving complex ground conditions, drainage requirements and electrical infrastructure before construction commenced. Sustainable construction practices, included on site reuse of demolition materials and extensive cut and fill operations, reduced waste and minimised environmental impact.

Careful logistical planning ensured construction traffic was managed around school opening and closing times to minimise disruption.

Zoom in
Zoom in
Zoom in

Our partners

  • M&E Engineer: Hoare Lea up to RIBA Stage 4 via David Pardine. Green and Webb via David Paradine from Stage 5
  • Structural Engineer: Nolans
  • Architect: Corstorphine and Wright
  • Framework: DfE Spec 21 Framework
Tilbury Douglas
Twitter LinkedIn YouTube

Trading address:
Oberon Road
Exeter Business Park
Exeter
EX1 3QD

0121 782 2727

  • Projects
  • Frameworks
  • Press releases
  • Modern slavery statement
  • Cookie policy
Build UK logo

Content © 2026 © 2026 Tilbury Douglas Construction Limited
Registered in England and Wales: 00303359 (Construction) and 03044398 (Engineering)
Registered office: 30 Eastcheap, London, EC3M 1HD. All rights reserved.

Powered by Greenhouse