Tilbury Douglas Tilbury Douglas
  • About
    • About us
    • Digital
    • ESG
    • Financial updates
    • Leadership team
    • Health and safety
    • History
    • Policies, reports and certificates
    • Supply chain
    • Sustainability
  • Sectors
    • Accommodation
    • Central and local government
    • Defence
    • Education
    • Health
    • Justice
    • Manufacturing, industrial and research
    • Water
  • Services
    • Regional Building
    • Engineering
    • Infrastructure
    • Paragon (Fit-out)
    • Decarbonisation
  • Projects
  • Frameworks
  • News & media
    • Press releases
    • Insight articles
    • Videos
  • Careers
    • Overview
    • Current vacancies
    • Early careers
    • Women in construction
  • Contact
    • Contact details
    • Office locations
14 September 2023

Tilbury Douglas completes the £20.5m extension of the Emergency Department & theatre suite at Aintree University Hospital

Tilbury Douglas has successfully completed the £20.5m extension of the Emergency Department and theatre suite at Aintree University Hospital for Liverpool University Hospitals NHS Foundation Trust.

The new two-storey extension, with hybrid operating theatres, features improved assessment areas, an enhanced Radiology Department and improvements to ambulance drop off bays on the ground floor.

The new dedicated Stroke Emergency Assessment Unit ensures that patients are swiftly clinically assessed using the CT scanner, so treatments are administered as soon as possible to ensure the optimum recovery outcome.

Phil Shaw, Divisional Director for the North West at Tilbury Douglas, said: “It is a great achievement from all those involved to be able to hand over the completed project to Liverpool University Hospitals NHS Foundation Trust.

“The new facilities will enable health professionals to deliver the care that patients deserve in a space fit for purpose with an enhanced layout. This will allow them to manoeuvre more quickly, driving clinical efficiencies and enhanced patient care for the local community.”

With a focus on social value, the project team worked with 93% local companies, which were all SMEs. With a social value return on investment of 78%, the team spent more than 210 hours of their time volunteering, which included transforming an inaccessible and underused courtyard into a respite garden to help alleviate stress among hospital staff, patients, and visitors. In addition, the project delivered more than 200 apprentice weeks whilst on site.

Tilbury Douglas
Twitter LinkedIn YouTube

Tilbury Douglas
Oberon Road
Exeter Business Park
Exeter
EX1 3QD


01392 203350
  • Projects
  • Frameworks
  • Press releases
  • Modern slavery
  • Cookie policy
Build UK logo Investors in Diversity logo

Content © 2026 © 2025 Tilbury Douglas Construction Limited
Registered in England and Wales: 00303359. All rights reserved.

Powered by Greenhouse