Tilbury Douglas Tilbury Douglas
  • About
    • About us
    • Digital
    • ESG
    • Financial updates
    • Health, safety and wellbeing
    • History
    • Inclusive procurement
    • Leadership team
    • Policies, reports and certificates
    • Supply chain
    • Sustainability
  • Sectors
    • Central and local government
    • Defence
    • Devolved government
    • Education
    • Health
    • Justice
    • Water
  • Services
    • Regional Building
    • Fit-Out
    • Engineering
    • Infrastructure
  • Projects
  • Frameworks
  • News & media
    • Press releases
    • Insight articles
    • Videos
  • Careers
    • Overview
    • Current vacancies
    • Early careers
    • Women in construction
  • Contact
    • Contact details
    • Office locations

Southampton General Hospital Car Park

  • Location: Southampton
  • Sector: Health
  • Service: Regional Building

Tilbury Douglas constructed a new six-storey, 778 bay car park at Southampton General Hospital in order to provide much needed car parking spaces in a congested major city hospital site.

View gallery Key stats

The new car parking provision improved the patient, visitor and staff experience and helped to meet the demand for on-site car parking. This project developed from a solid existing relationship with the hospital, having already successfully carried out several other projects at the hospital.

At a glance...

£9.5m

Project value

August 2017

Completion date

University Hospital Southampton NHS Trust

Client

The new car park was constructed on an existing surface level car park on the Southampton General Hospital campus. The design of the car park is a tiered design which creates the illusion of the car park being set back from the nearby residential properties, reducing the visual impact of the structure.

The car park structure is clad in a timber brise soleil, metal grating and also has greewall features to soften the visual impact of the building.

The site is in a relatively small area, in close proximity to live hospital buildings. Every consideration was taken in order to reduce the impact of the construction works on the working hospital. This included carefully timed deliveries, with strict instructions as to the delivery route. Noisy works were kept to a minimum and were discussed beforehand with the hospital; acoustic barriers were used as well to help mitigate the noise levels.

Works were on programme and to budget.

Southampton General Hospital Car Park Zoom in
Southampton General Hospital Car Park Zoom in
Southampton General Hospital Car Park Zoom in

Our partners

  • Architect: IBI Group
  • Structural Engineer: Hill Cannon
  • PM&E: TNG Consulting Engineers Ltd
Tilbury Douglas
Twitter LinkedIn YouTube

Tilbury Douglas
30 Eastcheap
London
EC3M 1HD

0121 782 2727

  • Projects
  • Frameworks
  • Press releases
  • Modern slavery
  • Cookie policy
Build UK logo

Content © 2026 © 2026 Tilbury Douglas Construction Limited
Registered in England and Wales: 00303359 (Construction) and 03044398 (Engineering). All rights reserved.

Powered by Greenhouse