Tilbury Douglas Tilbury Douglas
  • About
    • About us
    • Digital
    • ESG
    • Financial updates
    • Health, safety and wellbeing
    • History
    • Inclusive procurement
    • Leadership team
    • Policies, reports and certificates
    • Supply chain
    • Sustainability
  • Sectors
    • Central and local government
    • Defence
    • Devolved government
    • Education
    • Health
    • Justice
    • Water
  • Services
    • Regional Building
    • Engineering
    • Infrastructure
    • Paragon (Fit-out)
    • Decarbonisation
  • Projects
  • Frameworks
  • News & media
    • Press releases
    • Insight articles
    • Videos
  • Careers
    • Overview
    • Current vacancies
    • Early careers
    • Women in construction
  • Contact
    • Contact details
    • Office locations

St Mary’s Catholic
Voluntary Academy

  • Location: Derby
  • Sector: Education
  • Division: Regional Building

St Mary’s Catholic Voluntary Academy, part of the St Ralph Sherwin Multi Academies Trust, was awarded to Tilbury Douglas via the Department for Education (DfE) framework.

View gallery Key stats

A pilot school for the DfE, the project embraced key Construction Playbook themes, being net zero carbon in operation, low embodied carbon and a modern methods of construction (MMC) exemplar, including a future proofed digital strategy. It’s also the first school in the UK to have a biophilic design brief, promoting positive health and wellbeing for occupants through a building that harnesses the power of nature. These credentials combined have St.Mary’s dubbed as the ‘greenest school in the country’ by the DfE.

The existing school fell victim to an arson attack, with the school then housed in temporary accommodation. The construction of the new two-form entry primary school accommodates Key Stage 1 and 2 pupils and a 60-place on-site nursery. The school comprises five single-storey timber frame buildings linked by an exposed canopy. Between each building are landscaped areas and play areas to fulfil the aim of bringing the outside in.

At a glance...

£10.5m

Project value

December 2023

Completion date

Department for Education

Client

Environmentally friendly construction

Construction methods consisted of timber frames and cedar cladding, and internally construction elements such as pipework, timber glulam beams and polished concrete floors are exposed, in line with the biophilic brief.

Furniture is also made from natural materials such as timber where possible, to promote repairs to damages, rather than replacement.

The mechanical and electrical service installation was also different to standard DfE school projects and includes air source heat pumps as well as natural ventilation with heat recycling (NVHR) units, which were incorporated as part of the value engineering exercise.

“It’s an absolute privilege to be the headteacher of a school like this. The last few years have been full of challenges for us as a school in temporary accommodation, but it’s been worth it because the finished product is absolutely sensational.”

Amanda Greaves – Executive Head Teacher, St Mary’s Catholic Voluntary Academy

Biophilic brief

Through the delivery stages of St Mary’s Catholic Voluntary Academy, we sought to include appropriate design elements in response to the biophilic design brief set by the client.

These elements are grouped into the following themes:

  • Play and adventure
  • Learning landscapes
  • Materials
  • Natural world
  • Sanctuary
  • Connecting with nature
  • Sensory

We worked closely with Ares Landscape Architects, to implement an extensive landscaping specification including rain gardens and planting strategies.

External works include a green roof, upgrades to the existing multi use games area, creation of a new grassed football pitch and extension to the existing car park and drop off area.

St Mary’s Catholic Voluntary Academy Zoom in
St Mary’s Catholic Voluntary Academy Zoom in
St Mary’s Catholic Voluntary Academy Zoom in
St Mary’s Catholic Voluntary Academy Zoom in

Innovation

Finished on time, the project was delivered within a tight 12-month programme. The speed that the project was delivered was in part down to the Innovare Structural Insulated Panel (SIP) system; an interlocking, load bearing system, manufactured off-site and guaranteeing performance in terms of thermal insulation, fire safety and acoustics, as well as environmentally friendly materials and finishes. We designed to multiples of 1.2m x 3.6m grids, to boost efficiency and minimise waste.

The floor and ceiling SIPs strategy not only supports the school in its low embodied carbon aspirations, but also makes maintenance easier moving forwards, by omitting suspended ceilings and cavity MEP.

The offsite strategy also assisted with controlling project costs, bringing the project within the agreed budget. Few building methods can match panelised offsite techniques in reducing time, cost and risk without compromising quality of materials or construction.

Applying an MMC strategy throughout, detailed elements also met MMC status, including actuators, which arrived on-site, pre-fitted as part of the window solution. Additionally, pre-hung doorsets were installed throughout, a number of which were fitted off-site with mag-locks.

“St Mary’s innovative use of timber based structurally insulated panel systems and roof cassettes enabled rapid delivery of the project and has demonstrated the value of standardisation in construction.”

Duncan Craig – Technical Policy Lead, DfE

Our partners

  • Structural Engineer: Adept
  • M&E Engineer: Cundall
  • Architect: Hawkins Brown, Ares – Landscape Architects
Tilbury Douglas
Twitter LinkedIn YouTube

Tilbury Douglas
30 Eastcheap
London
EC3M 1HD

0121 782 2727

  • Projects
  • Frameworks
  • Press releases
  • Modern slavery
  • Cookie policy
Build UK logo

Content © 2026 © 2026 Tilbury Douglas Construction Limited
Registered in England and Wales: 00303359 (Construction) and 03044398 (Engineering). All rights reserved.

Powered by Greenhouse