Tilbury Douglas Tilbury Douglas
  • About
    • About us
    • Digital
    • ESG
    • Financial updates
    • Health, safety and wellbeing
    • History
    • Inclusive procurement
    • Leadership team
    • Policies, reports and certificates
    • Supply chain
    • Sustainability
  • Sectors
    • Central and local government
    • Defence
    • Devolved government
    • Education
    • Health
    • Justice
    • Water
  • Services
    • Regional Building
    • Engineering
    • Infrastructure
    • Paragon (Fit-out)
    • Decarbonisation
  • Projects
  • Frameworks
  • News & media
    • Press releases
    • Insight articles
    • Videos
  • Careers
    • Overview
    • Current vacancies
    • Early careers
    • Women in construction
  • Contact
    • Contact details
    • Office locations

Telford Bus Station

  • Location: Telford
  • Sector: Leisure
  • Division: Regional Building

We completed a new bus station replacing an existing bus station to facilitate the extension and development of the town centre.

View gallery Key stats

The project included the construction of a new 12 bay, steel portal frame bus station for Telford Shopping Centre to replace the existing station. The new building comprises a cladding roof liner with an aluminium soffit. The rear SFS wall is covered in porcelain tile whilst the remaining elevations are half height glazed screens. Works also included Highways alterations to the surrounding area.

At a glance...

£2.3m

Project value

December 2019

Completion date

Sovereign Retail

Client

Telford Bus Station

Challenges and solutions

  • Tight and congested site located in an operational bus station
  • Careful planning to ensure no disruption, including segregation from the public and temporary walkways
  • Extensive service diversion
  • Stakeholder engagement and liaison with specialist contractors

The works were phased to ensure the existing bus station was kept live and that no disruption was caused to the busy shopping centre, discussions with all stakeholders and careful planning was vital, a temporary walkway to the shopping centre was constructed whilst works were ongoing.

Telford Bus Station Zoom in
Telford Bus Station Zoom in

We liaised closely with the Senior Citizens Transport Forum keeping them fully up to date with plans and progress.

Our partners

  • Architect: Benoy
  • M&E Engineer: Dodd Group
  • Structural Engineer: Waterman
  • Project Manager: WT Partnership
  • Cost Manager: WT Partnership
Tilbury Douglas
Twitter LinkedIn YouTube

Tilbury Douglas
30 Eastcheap
London
EC3M 1HD

0121 782 2727

  • Projects
  • Frameworks
  • Press releases
  • Modern slavery
  • Cookie policy
Build UK logo

Content © 2026 © 2026 Tilbury Douglas Construction Limited
Registered in England and Wales: 00303359 (Construction) and 03044398 (Engineering). All rights reserved.

Powered by Greenhouse