Tilbury Douglas Tilbury Douglas
  • About
    • About us
    • Digital
    • ESG
    • Financial updates
    • Health, safety and wellbeing
    • History
    • Inclusive procurement
    • Leadership team
    • Policies, reports and certificates
    • Supply chain
  • Sectors
    • Central and local government
    • Defence
    • Devolved government
    • Education
    • Health
    • Justice
    • Water
  • Services
    • Regional Building
    • Fit-Out
    • Engineering
    • Infrastructure
  • Projects
  • Frameworks
  • News & media
    • Press releases
    • Insight articles
    • Videos
  • Careers
    • Overview
    • Current vacancies
    • Early careers
    • Women in construction
  • Contact
    • Contact details
    • Office locations

Wythenshawe Hospital Emergency Department

  • Location: Manchester
  • Sector: Health
  • Service: Regional Building

This project doubled the size of the existing Emergency Department to ensure Wythenshawe Hospital could continue to provide first class emergency treatment and care to patients, in quality surroundings that continued to meet increasing demands.

View gallery Key stats

The works were completed in three phases:

Phase one new build – construction of a 2,195m² three-storey extension to the front of the existing, live Emergency Department (ED) to provide new triage, major and minor injury treatment areas, a new waiting area, reception and new dedicated emergency corridor with separate ambulance and ambulant entrance.

Phase two refurbishment – 1,501m² internal refurbishment to the existing department providing new resuscitation bays, paediatrics ED, X-ray rooms.

Phase three refurbishment – provided improved relatives’ facilities, GP offices, seminar rooms and upgraded staff facilities.

The works included the installation of a new plant room, new ambulance bays, turning area, canopy, SMART car parking bays, drop-off area, decontamination facility and hard landscaping.

At a glance...

£11m

Project value

May 2019

Completion date

Manchester University NHS Foundation Trust

Client

Challenges and solutions

Tilbury Douglas delivered this vital project within the confines of a live Emergency Department treating critically ill patients with demolition and refurbishment undertaken below the live operating theatres.

We completed the construction, services integration, isolations to the wider hospital and medical gases break-ins without impacting access for blue lights and the helipad.

“Delivering a new building while running a live Emergency Department has many challenges. These challenges are eased with effective teamwork. Tilbury Douglas have been an integral part of the team to deliver the building. They have done this safely, with flexibility and have adapted where necessary. They have delivered a building to a high standard and have been a pleasure to work with them.”

Joanna Jarvis, Matron for Wythenshawe Emergency Department and Clinical Decisions Unit

Added value

The project was delivered within budget, accident free and with a social value return on investment of £5.1m for the local community.

Efficiencies created:

  • Ambulance turnaround time reduced from 38 minutes to 22 minutes
  • Department efficiency increased by 15%
Wythenshawe Hospital Emergency Department Zoom in
Wythenshawe Hospital Emergency Department Zoom in
Wythenshawe Hospital Emergency Department Zoom in
Wythenshawe Hospital Emergency Department Zoom in
Wythenshawe Hospital Emergency Department Zoom in
Wythenshawe Hospital Emergency Department Zoom in

Our partners

  • Architect: IBI Group
  • Civil & Structural Engineer: Sutcliffe
  • M&E Consultant: DSSR
  • Cost Consultant: Rider Hunt
Tilbury Douglas
Twitter LinkedIn YouTube

Trading address:
Oberon Road
Exeter Business Park
Exeter
EX1 3QD

0121 782 2727

  • Projects
  • Frameworks
  • Press releases
  • Modern slavery
  • Cookie policy
Build UK logo

Content © 2026 © 2026 Tilbury Douglas Construction Limited
Registered in England and Wales: 00303359 (Construction) and 03044398 (Engineering)
Registered office: 30 Eastcheap, London, EC3M 1HD. All rights reserved.

Powered by Greenhouse